Duct fittings built from the measurements you took on site.
/transition - also /elbow, /tee or
/fitting, whichever word you reach for.
It asks for the measurements a fitter would take, and builds the piece. You are not drawing it; you are describing it.
20,
20.5, 8 3/4.The tape is worked against the sizes you gave, so the openings have to read before the rest of the fields will.
A solid you can push, cut, dimension and export like anything else, and a ticket with the numbers on it. Laying it out flat turns it into a pattern to cut from sheet.